Rated highly by homeownersRated highly by homeowners across Harrogate

Bathroom renovation in Harrogate

Harrogate is where our office is and where we work closest to base. From the centre out to Starbeck, Bilton, Pannal and the newer estates on the edges, the same crew and the same project lead look after your bathroom from strip-out to handover. It always starts with a free consultation, at your house or online.

  • five yearsguarantee on installation and fitting
  • one total pricestrip-out, materials, labour and waste
  • we look firstand quote after

Book your free consultation in Harrogate

Enter your first name.

Enter your surname.

Enter a valid email address.

Enter a UK phone number, for example 07700 900123.

We ring you within one working day to pick a moment, at your home or online. You are not committed to anything.

Demo form: nothing you type here is sent anywhere.

Harrogate homes, and what they mean for a bathroom

A lot of Harrogate is Victorian and Edwardian stone: terraces, villas and larger houses, some of them split into flats. Bathrooms in those houses were often added later, squeezed into a box room or the end of a landing, and the floor underneath is usually timber joists rather than concrete.

A timber floor moves, and tiles do not like movement. So in an older house we look at what the joists are doing, whether the floor needs boarding before anything goes on it, and how old the pipework is behind the walls. In a flat we also think about the ceiling of whoever lives below.

Further out you will find inter-war semis and the newer estates on the edges, with concrete ground floors and more standard room sizes. That is often simpler work, but not always. We only know once we have looked, which is why the quote comes after the consultation and never before.

Before and after.

Two jobs we have delivered.

BeforeBathroom before the work, stripped back to the original layout
AfterThe same bathroom after the work, with a walk-in shower and new vanity

Taken over after the work had stalled.

What we found

  • Left half stripped, substrate exposed
  • No record of what had already been done

What we did

  • Mapped the existing situation, repaired the substrate
  • Pipework and wiring pressure tested before anything closed up
  • Falls measured, not guessed
  • Waterproof layer with sealing tape in every corner
BeforeCloakroom before the work, with dated tiling and a pedestal basin
AfterThe same cloakroom after the work, with a wall-hung basin and new tiling

Cloakroom, from dated to plain.

What we found

  • White tiles with a patterned border
  • Old pan and basin
  • Exposed pipework

What we did

  • Large light-format tiles
  • Wall-hung black pan, black basin
  • Wall-mounted tap and recesses set into the tiling
Vanity unit in black with two round dark stone basins, black wall-mounted taps and a wide lit mirror with recesses beside it
  • recesses
  • wall-mounted taps
  • two stone basins
Vanity unit in black with two round dark stone basins, black wall-mounted taps and a wide lit mirror with recesses beside it
Twin oval mirrors above a double vanity with brass taps
  • two oval mirrors
  • brass taps
  • vanity unit
Twin oval mirrors above a double vanity with brass taps
Walk-in shower in green natural stone with a concealed valve
  • natural stone tiles
  • walk-in shower
Walk-in shower in green natural stone with a concealed valve

How much does a new bathroom cost in Harrogate?

It depends on the size of the room, what turns out to be under the floor and behind the walls, and the sanitaryware and tiles you choose. After the consultation you get one total price covering strip-out, materials, labour and waste removal. Sanitaryware is not included: you supply it, or it runs through us. Nothing gets added halfway.

If a quote sits well under what a bathroom actually costs, something has been left out. You just cannot see what, because it is behind the tiles.

What a full renovation covers, from strip-out to handover, is on the complete bathroom renovation page.

Already holding a quote?

Search it for these words. If they are not in it, you know enough, and that applies to a quote from anyone else just as much as to ours.

  • primingWithout primer, nothing that follows bonds properly.
  • the waterproof layerThis is the layer that stops the water. Not the tile.
  • sealing tapeIn every corner and at every junction. Exactly where a leak starts.
  • the adhesive coverageFull coverage, not dabs on the corners.
  • the pipework typeFewer joints means fewer places it can leak.
  • the fallsMeasured, not estimated.
  • the guaranteeAnd who you ring about it.

How it works with us.

  1. Bathroom with a large round lit mirror, a wall-hung oak vanity unit with two basins and a freestanding bath

    We come and look first. Then a clear price.

    We come out before anything goes on paper. What we see is in the price.

  2. Cloakroom with an oval mirror, marble-effect walls and a wall-hung WC

    Our own fitters no agency cover

    The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

  3. Bathroom with a freestanding bath under a long window, a wall-hung WC and a white towel radiator

    One project lead from strip-out to handover

    Who checks every stage before the next one goes on top of it.

What customers say.

Example reviews, written for this demo in the shape a real profile gives them. Read them all

  • We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.

    Helen M.Example review

  • Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.

    Ed W.Example review

  • Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!

    Kerry B.Example review

  • We had a really lovely bathroom and separate WC put in at our new place. The planning stage was handled brilliantly, nothing was treated as impossible, it was just a question of working out how. The team on site were tidy and gave us regular updates. Unfortunately towards the end there was a lack of communication, partly because of someone being off sick. The project overran a bit and it took two handover visits to close everything off properly. Even so, a genuinely beautiful bathroom for a fair price.

    Tom F.Example review

The difference is never in the tiles.

A bathroom renovation is thirteen stages and you only ever see one of them. The rest decide whether it lasts for decades.

layer 01Substrateassessed and repaired
layer 02Pipeworkpressure tested before it closes up
layer 03Fallsmeasured, one to two centimetres per metre
layer 04Primerthe most skipped stage
layer 05Waterproof layerwith sealing tape in every corner
layer 06Adhesivefull notched-trowel bed
layer 07Tilechecked with a spirit level
layer 08Grout and sealantright first time

Look first. Quote after.

A quote given without anyone looking is not a quote. It is a guess.

What you get

  • a conversation at your home or online, whenever suits you
  • what is possible in your room, and what it would take
  • a quote made for your room, only after we have looked

Frequently asked questions.

Can I come and see you at a showroom in Harrogate?

We do not have a showroom. Our office in Harrogate is where the planning and invoicing happen. The consultation takes place at your house, or online if that suits you better, because that is where the bathroom actually is.

Do you cover Starbeck, Bilton and Pannal as well?

Yes. The whole of Harrogate and the newer estates on the edges are part of our home patch. Fill in the form and we ring back within one working day to pick a moment.

How long does a complete bathroom take?

Two to three weeks. The waterproof layer has to cure before any tile goes on, and that day is never cut from the plan. Anyone promising much less is skipping something.

Who checks the work while it is going on?

One project lead checks every stage, from strip-out to handover. The fitters are the same people who have worked together for years, so each stage is built by people who saw the one before it.

Keep up with what we build.

Leave your email address. Now and then a finished bathroom in your inbox, and what we found under its tiles.

Demo form: nothing you type here is sent anywhere.