Bathroom renovation in Knaresborough
Knaresborough sits just east of our home town, a few minutes down the road, and everything around Scriven and Calcutt falls inside the same patch.
In Knaresborough we build a bathroom exactly as we do in every other town we cover. That sounds dull, and it is. The thirteen stages are fixed, because the order a bathroom goes together in is not a local matter. What differs house to house sits under the floor and behind the wall.
The bathroom survey normally costs
£169
We cover it.
Before and after.
Two jobs we have delivered.


Taken over after the work had stalled.
What we found
- Left half stripped, substrate exposed
- No record of what had already been done
What we did
- Mapped the existing situation, repaired the substrate
- Pipework and wiring pressure tested before anything closed up
- Falls measured, not guessed
- Waterproof layer with sealing tape in every corner


Cloakroom, from dated to plain.
What we found
- White tiles with a patterned border
- Old pan and basin
- Exposed pipework
What we did
- Large light-format tiles
- Wall-hung black pan, black basin
- Wall-mounted tap and recesses set into the tiling

- lit recess
- concealed valves

- black recess
- towel radiator
- long trough basin

- marble effect
- mosaic band
- vanity unit
The difference is never in the tiles.
A bathroom renovation is thirteen stages and you only ever see one of them. The rest decide whether it lasts for decades.
Why a low quote turns out expensive.
You supply the sanitaryware yourself or it runs through us. What you pay us for is the building and the craft.
If a quote sits well under what a bathroom actually costs, something has been left out. You just cannot see what, because it is behind the tiles. It surfaces when it fails, and then you pay for it a second time.
If it is only the cloakroom, that is a smaller job with the same layers underneath it. See what a cloakroom renovation involves.
Four things you can see for yourself.
You do not need a tradesman to tell you something is up. If any of these look familiar, there is more going on than the surface shows.
- Discoloured groutEven after you clean it. That means moisture is sitting in the grout.
- Sealant liftingSealant never lets go for no reason. And water runs away behind loose sealant.
- The bucket testThrow a bucket of water on your shower floor. If it does not run to the waste, your falls are wrong.
- A smell from the wasteThat smell is coming from the drain. Something is connected wrongly.
How it works with us.
And that is how it should work.

Take stock first. Then a clear price.
We come out before anything goes on paper. A quote without looking is a guess, and you are the one who pays for it.

Our own fitters no agency cover
The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

One project lead from strip-out to handover
Who checks every stage before the next one goes on top of it.
What customers say.
In their own words.
Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!
Kerry B.Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.
Ed W.We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.
Helen M.
Questions everyone asks.
What does a bathroom cost?
It depends on what is behind your walls, which is the honest answer and the reason we look before quoting. The costs page shows how to build the figure up yourself so you can price any quote you are holding.
Where do I wash while the bathroom is out?
Most people use a cloakroom or a neighbour for the two to three weeks. We tell you at the survey exactly which days the water is off rather than leaving you to find out.
How do I know my bathroom was waterproofed properly?
You cannot see it once it is tiled, which is the problem. The self-checks on this page are the closest you get without opening anything up.
How long does a bathroom renovation take?
Two to three weeks. That is drying time, not slowness. Anyone promising it inside a week is compressing stage eight.
What guarantee do I get?
Five years on installation and fitting, one year on grouting and sealant, in writing. The market gives one to three years and sometimes nothing at all.
Is it better at my house or online?
At your house, every time. The whole value of the survey is somebody looking at the thing, and nobody can assess a substrate through a phone screen.
Am I committed to anything?
No. You get the report either way and you can take it to anyone. That is the point of it.
What if there is nothing wrong?
Then that is what the report says, and you have a written record that your room is sound. That is a perfectly good outcome.
Is your question not here? Ask it here and you will have an answer within 24 hours.
Look first. Quote after.
A quote given without anyone looking is not a quote. It is a guess.
The bathroom survey normally costs
£169
We cover it.
What you get
- a written report of everything we find
- a quote for your room, with everything in it
- an honest answer. If you have got years left in it, we will just tell you that
With that report in your hand you can compare anyone. Us included.
Not ready yet?
A reply within 24 hours. No obligation, just a clear answer on what is needed and what it costs.