We build the bathroom, from the bottom up.
A bathroom, a cloakroom or just the sanitaryware. The work underneath is the same, and that decides whether it is right.

Bathroom renovation
From strip-out to handover. One settled team, one point of contact, and the planning and costs clear before we start.

Cloakroom renovation
The smallest room in the house, and the one where poor work shows up fastest and closest.

Sanitaryware and tiling
Supply it yourself or let it run through us. Either way it has to fit and work.
Before and after.


Taken over after the work had stalled.
What we found
- Left half stripped, substrate exposed
- No record of what had already been done
What we did
- Mapped the existing situation, repaired the substrate
- Pipework and wiring pressure tested before anything closed up
- Falls measured, not guessed
- Waterproof layer with sealing tape in every corner


Cloakroom, from dated to plain.
What we found
- White tiles with a patterned border
- Old pan and basin
- Exposed pipework
What we did
- Large light-format tiles
- Wall-hung black pan, black basin
- Wall-mounted tap and recesses set into the tiling
How it works with us.

We come and look first. Then a clear price.
We come out before anything goes on paper. What we see is in the price.

Our own fitters no agency cover
The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

One project lead from strip-out to handover
Who checks every stage before the next one goes on top of it.
What customers say.
Example reviews, written for this demo in the shape a real profile gives them. Read them all
We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.
Helen M.Example review
Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.
Ed W.Example review
Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!
Kerry B.Example review
We had a really lovely bathroom and separate WC put in at our new place. The planning stage was handled brilliantly, nothing was treated as impossible, it was just a question of working out how. The team on site were tidy and gave us regular updates. Unfortunately towards the end there was a lack of communication, partly because of someone being off sick. The project overran a bit and it took two handover visits to close everything off properly. Even so, a genuinely beautiful bathroom for a fair price.
Tom F.Example review
Look first. Quote after.
A quote given without anyone looking is not a quote. It is a guess.
What you get
- a conversation at your home or online, whenever suits you
- what is possible in your room, and what it would take
- a quote made for your room, only after we have looked
Frequently asked questions.
Does the consultation cost anything?
No. The conversation costs you nothing and commits you to nothing. We look together at what you want and what is technically possible, and after that you get a quote made for your room.
What happens after I fill in the form?
We ring you within one working day to pick a moment. In the consultation we talk through what you want, the state of your bathroom and what you can expect from us.
Can the consultation be online?
Yes. At your home is our preference, because then we see the bathroom itself. If you do not have the keys yet, or the house is still being built, we think it through with you online and pencil the renovation in.
How long does a bathroom renovation take?
Two to three weeks. The waterproof layer has to cure before anything is tiled, and that day never comes out of the plan.
Can I choose my own sanitaryware?
Yes. You supply it yourself or it runs through us, either is fine. What we do is the building: strip-out, pipework, falls, waterproofing, tiling and fitting. That is one total price.
Is your question not here? Ask it here and you will have an answer within 24 hours.
