Bathroom renovation in Ripon

Ripon lies north of Harrogate. The surrounding villages, including Sharow, Bishop Monkton and Kirkby Malzeard, are inside our regular area.

There is no separate way of building a bathroom in Ripon. Substrate, pipework, falls and the waterproof layer come in the same order everywhere, and anyone who reverses that order gets the same problems everywhere. The difference is in the house, not the town.

The bathroom survey normally costs

£169

We cover it.

Book a bathroom survey

Before and after.

Two jobs we have delivered.

BeforeBathroom before the work, stripped back to the original layout
AfterThe same bathroom after the work, with a walk-in shower and new vanity

Taken over after the work had stalled.

What we found

  • Left half stripped, substrate exposed
  • No record of what had already been done

What we did

  • Mapped the existing situation, repaired the substrate
  • Pipework and wiring pressure tested before anything closed up
  • Falls measured, not guessed
  • Waterproof layer with sealing tape in every corner
BeforeCloakroom before the work, with dated tiling and a pedestal basin
AfterThe same cloakroom after the work, with a wall-hung basin and new tiling

Cloakroom, from dated to plain.

What we found

  • White tiles with a patterned border
  • Old pan and basin
  • Exposed pipework

What we did

  • Large light-format tiles
  • Wall-hung black pan, black basin
  • Wall-mounted tap and recesses set into the tiling
Freestanding bath beside a window with brass taps and a tiled surround
  • oval mirror
  • sash window
  • brass taps
Freestanding bath beside a window with brass taps and a tiled surround
Herringbone tiling in green with a dark stone basin and matt black tap
  • oval mirror
  • green herringbone tiles
Herringbone tiling in green with a dark stone basin and matt black tap
Freestanding bath on timber-effect flooring with a round mirror behind
  • round mirror
  • timber vanity unit
  • freestanding bath
Freestanding bath on timber-effect flooring with a round mirror behind

The difference is never in the tiles.

A bathroom renovation is thirteen stages and you only ever see one of them. The rest decide whether it lasts for decades.

layer 01Substrateassessed and repaired
layer 02Pipeworkpressure tested before it closes up
layer 03Fallsmeasured, one to two centimetres per metre
layer 04Primerthe most skipped stage
layer 05Waterproof layerwith sealing tape in every corner
layer 06Adhesivefull notched-trowel bed
layer 07Tilechecked with a spirit level
layer 08Grout and sealantright first time

Why a low quote turns out expensive.

You supply the sanitaryware yourself or it runs through us. What you pay us for is the building and the craft.

If a quote sits well under what a bathroom actually costs, something has been left out. You just cannot see what, because it is behind the tiles. It surfaces when it fails, and then you pay for it a second time.

You supply the sanitaryware and tiles yourself, or let them run through us. Why it works that way is explained under sanitaryware and tiling.

Four more you can check yourself.

None of these four needs a tool. They only tell you whether it is still right behind the tiles.

  • The coin testTap your tiles with a coin. If one sounds hollow, there is air where adhesive should be.
  • Limescale or green stainingUnder the basin, in the places where water sits that should have drained away.
  • Worn floor groutA grout line should be the same depth everywhere. Where it thins, it is nearly gone.
  • Mould in the cornersOr flaking paint on the ceiling. Moisture that hangs around settles somewhere.

How it works with us.
And that is how it should work.

  • Bathroom with a large round lit mirror, a wall-hung oak vanity unit with two basins and a freestanding bath

    Take stock first. Then a clear price.

    We come out before anything goes on paper. A quote without looking is a guess, and you are the one who pays for it.

  • Cloakroom with an oval mirror, marble-effect walls and a wall-hung WC

    Our own fitters no agency cover

    The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

  • Bathroom with a freestanding bath under a long window, a wall-hung WC and a white towel radiator

    One project lead from strip-out to handover

    Who checks every stage before the next one goes on top of it.

What customers say.
In their own words.

  • Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!
    Kerry B.
  • Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.
    Ed W.
  • We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.
    Helen M.

Questions everyone asks.

What does a bathroom cost?

It depends on what is behind your walls, which is the honest answer and the reason we look before quoting. The costs page shows how to build the figure up yourself so you can price any quote you are holding.

Where do I wash while the bathroom is out?

Most people use a cloakroom or a neighbour for the two to three weeks. We tell you at the survey exactly which days the water is off rather than leaving you to find out.

How do I know my bathroom was waterproofed properly?

You cannot see it once it is tiled, which is the problem. The self-checks on this page are the closest you get without opening anything up.

How long does a bathroom renovation take?

Two to three weeks. That is drying time, not slowness. Anyone promising it inside a week is compressing stage eight.

What guarantee do I get?

Five years on installation and fitting, one year on grouting and sealant, in writing. The market gives one to three years and sometimes nothing at all.

Is it better at my house or online?

At your house, every time. The whole value of the survey is somebody looking at the thing, and nobody can assess a substrate through a phone screen.

Am I committed to anything?

No. You get the report either way and you can take it to anyone. That is the point of it.

What if there is nothing wrong?

Then that is what the report says, and you have a written record that your room is sound. That is a perfectly good outcome.

Is your question not here? Ask it here and you will have an answer within 24 hours.

Look first. Quote after.

A quote given without anyone looking is not a quote. It is a guess.

The bathroom survey normally costs

£169

We cover it.

What you get

  • a written report of everything we find
  • a quote for your room, with everything in it
  • an honest answer. If you have got years left in it, we will just tell you that

With that report in your hand you can compare anyone. Us included.