Thirteen stages. You never see most of them again.

A bathroom renovation is thirteen stages and you only ever see one of them. Below is every stage: what we do, why it takes skill, and what a worse firm does here.

Everything that sits under your tiles.

The grout does not stop water. The layer underneath does. Everything you can see is there to look good.

Pick a layer to see what goes wrong there.

From strip‑out to handover.

We do stage two before stage one. That is the survey: we look at the substrate before a single tile comes off.

Wide view of a bath and walk-in shower with timber-effect flooring
Bath and walk-in shower in one room, with a timber wall opposite.
  1. Stage 02 / 13

    Assessing the substrate

    What we do

    • Look at what is actually there. Is the floor flat, is it dry, is it strong enough.
    • Is there moisture in the walls, is there mould, has anything rotted.
    • And the important part: we do this before we start. That is the survey.

    Why it takes skill

    This is the stage where experience is worth most, because nothing happens. You are only looking.

    But you have to see what is going on. A damp patch that means nothing and a damp patch that means everything look identical.

    Do it up front and you know before you sign. And then it is in the price.

    What a worse firm does

    • Not looking first, and finding the problem once the job is open. Or knowing already and saving it for that moment.
    • Because then it is not an awkward conversation at the kitchen table, it is an announcement in a bathroom that has been ripped apart.

None of the above can be read off a finished room. Which is why it is better asked up front than discovered later.

Two to three weeks.

Drying times do not lie. Anyone promising it inside a week is skipping something. The waterproof layer has to cure before anything goes over it, and from the top it always looks dry before it is dry underneath.

It is also the easiest day to cut from a programme and the most expensive one to skip. Go on too early and the adhesive does not bond and the layer underneath tears. At that point the waterproofing is worth nothing.

Walk-in shower in the finished bathroom, with a concealed valve and a tiled recess
walk-in · finished
Walk-in shower in green natural stone with a concealed valve
  • natural stone tiles
  • walk-in shower
Walk-in shower in green natural stone with a concealed valve
Brass shower set with a tiled recess and concealed valve
  • brass rainfall head
  • tiled recess
Brass shower set with a tiled recess and concealed valve

We come and look before a single tile comes off.

At your house or online, your choice. We go through all of it: the floor, the grout, the sealant, the falls, the waste. After that you know exactly what is going on and what will work in your room.

The bathroom survey normally costs

£169

We cover it.

What you get

  • a written report of everything we find
  • a quote for your room, with everything in it
  • an honest answer. If you have got years left in it, we will just tell you that