Rated highly by homeownersRated highly by homeowners across Harrogate

Bathroom renovation in Pateley Bridge and Nidderdale

Pateley Bridge sits up in Nidderdale, north-west of Harrogate, and the dale villages above it are inside the same area. We start by looking at the house, because in the dale that is where the surprises are.

  • five yearsguarantee on installation and fitting
  • one total pricestrip-out, materials, labour and waste
  • we look firstand quote after

Book your free consultation in Pateley Bridge

Enter your first name.

Enter your surname.

Enter a valid email address.

Enter a UK phone number, for example 07700 900123.

We ring you within one working day to pick a moment, at your home or online. You are not committed to anything.

Demo form: nothing you type here is sent anywhere.

Dale cottages and what they ask of a bathroom

Many homes in Pateley Bridge and the villages above it are stone cottages and older houses. Walls are thick, rooms are often small, ceilings can be low, and a bathroom may sit under the eaves or have been made from part of a bedroom.

That affects where water can run, how the floor has to be prepared and what fits in the space. A small room can still take a good shower, but the layout has to be worked out on site. We only say what is possible once we have seen it.

Before and after.

Two jobs we have delivered.

BeforeBathroom before the work, stripped back to the original layout
AfterThe same bathroom after the work, with a walk-in shower and new vanity

Taken over after the work had stalled.

What we found

  • Left half stripped, substrate exposed
  • No record of what had already been done

What we did

  • Mapped the existing situation, repaired the substrate
  • Pipework and wiring pressure tested before anything closed up
  • Falls measured, not guessed
  • Waterproof layer with sealing tape in every corner
BeforeCloakroom before the work, with dated tiling and a pedestal basin
AfterThe same cloakroom after the work, with a wall-hung basin and new tiling

Cloakroom, from dated to plain.

What we found

  • White tiles with a patterned border
  • Old pan and basin
  • Exposed pipework

What we did

  • Large light-format tiles
  • Wall-hung black pan, black basin
  • Wall-mounted tap and recesses set into the tiling
Two natural stone basins with copper taps on a timber shelf
  • organic-shaped mirror
  • stone basins
  • copper taps
Two natural stone basins with copper taps on a timber shelf
Double basin vanity with a bath along the opposite wall
  • lit mirror
  • double basin
  • bath along the wall
Double basin vanity with a bath along the opposite wall
Brass shower set with a tiled recess and concealed valve
  • brass rainfall head
  • tiled recess
Brass shower set with a tiled recess and concealed valve

What does a bathroom cost in Pateley Bridge?

The price follows the room: how big it is, what is under the floor and behind the walls, and the tiles and sanitaryware you pick. After the consultation you get one total price with strip-out, materials, labour and waste removal included.

If a quote sits well under what a bathroom actually costs, something has been left out. You just cannot see what, because it is behind the tiles.

If it is only the cloakroom, that is a smaller job with the same layers underneath it. See what a cloakroom renovation involves.

Why this takes experience.

Six stages where the difference between right and nearly right stops being visible the moment the job is done.

  • Assessing the substrateNothing happens, you are only looking. But a damp patch that means nothing and a damp patch that means everything look identical.
  • Forming the fallsCentimetres across a whole floor, falling evenly. And it cannot be corrected: once the floor is down, it is down.
  • WaterproofingOne hole a millimetre across and the whole layer is worthless. You are only as waterproof as your weakest point.
  • DryingFrom the top it always looks dry before it is dry underneath. So you cannot trust what you can see.
  • TilingIt starts with the first tile. Half a millimetre out there and the error carries all the way to the other side.
  • GroutingWash off too early and you rinse the grout out of the joints. Too late, and a haze is left on your tiles that never comes off.

How it works with us.

  1. Bathroom with a large round lit mirror, a wall-hung oak vanity unit with two basins and a freestanding bath

    We come and look first. Then a clear price.

    We come out before anything goes on paper. What we see is in the price.

  2. Cloakroom with an oval mirror, marble-effect walls and a wall-hung WC

    Our own fitters no agency cover

    The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

  3. Bathroom with a freestanding bath under a long window, a wall-hung WC and a white towel radiator

    One project lead from strip-out to handover

    Who checks every stage before the next one goes on top of it.

What customers say.

Example reviews, written for this demo in the shape a real profile gives them. Read them all

  • We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.

    Helen M.Example review

  • Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.

    Ed W.Example review

  • Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!

    Kerry B.Example review

  • We had a really lovely bathroom and separate WC put in at our new place. The planning stage was handled brilliantly, nothing was treated as impossible, it was just a question of working out how. The team on site were tidy and gave us regular updates. Unfortunately towards the end there was a lack of communication, partly because of someone being off sick. The project overran a bit and it took two handover visits to close everything off properly. Even so, a genuinely beautiful bathroom for a fair price.

    Tom F.Example review

The difference is never in the tiles.

A bathroom renovation is thirteen stages and you only ever see one of them. The rest decide whether it lasts for decades.

layer 01Substrateassessed and repaired
layer 02Pipeworkpressure tested before it closes up
layer 03Fallsmeasured, one to two centimetres per metre
layer 04Primerthe most skipped stage
layer 05Waterproof layerwith sealing tape in every corner
layer 06Adhesivefull notched-trowel bed
layer 07Tilechecked with a spirit level
layer 08Grout and sealantright first time

Look first. Quote after.

A quote given without anyone looking is not a quote. It is a guess.

What you get

  • a conversation at your home or online, whenever suits you
  • what is possible in your room, and what it would take
  • a quote made for your room, only after we have looked

Frequently asked questions.

Do you cover the villages further up the dale?

Yes, the dale villages above Pateley Bridge are inside the same area. If you are unsure about your address, give us a ring and we will just tell you.

Our cottage bathroom is tiny. Is it worth doing properly?

Yes. A small room has exactly the same layers under the tiles as a big one, and those layers decide how long it lasts. We look at the space and tell you what fits.

Can the consultation be online instead?

It can. You show us the room on a video call and we ask about the floor, the walls and the pipework. If something needs a closer look we say so.

How long does the work take?

Two to three weeks for a complete bathroom. The waterproof layer has to cure before tiling, and we never cut that day from the plan.

Keep up with what we build.

Leave your email address. Now and then a finished bathroom in your inbox, and what we found under its tiles.

Demo form: nothing you type here is sent anywhere.