Bathroom renovation
A complete bathroom needs several specialists. That is why one settled team of tradespeople works on your bathroom at Wrenfield, so the pipework, electrics, waterproofing, tiling and fitting all line up with each other.
Before and after.


Taken over after the work had stalled.
What we found
- Left half stripped, substrate exposed
- No record of what had already been done
What we did
- Mapped the existing situation, repaired the substrate
- Pipework and wiring pressure tested before anything closed up
- Falls measured, not guessed
- Waterproof layer with sealing tape in every corner
What we do.
- Strip-out and removal
- Everything out, back to bare substrate. Not half of it, because you cannot build on something when you do not know whether it is sound.
- Assessing and repairing the substrate
- Flat, dry and strong enough. If it is not, we put that right before anything else happens.
- Pipework and electrics
- Run new and pressure tested before anything covers it. After this stage you cannot reach any of it again without breaking something.
- Falls and waterproofing
- The falls measured rather than estimated, and a waterproof layer with sealing tape in every corner and at every junction.
- Tiling
- Full adhesive coverage under every tile, external corners mitred rather than hidden behind a trim.
- Grouting, fitting and sealing
- In the colour you choose, not whichever one happens to be in stock. Everything connected and tested before we leave.

- dark tiles
- round mirror
- freestanding bath

- black framed glass screen
- brass tap
- natural stone

- oval mirror
- green herringbone tiles
Why it works this way.
Four trades, one settled team
Plumbing, electrics, waterproofing and tiling are four trades. At Wrenfield those tradespeople work together as one settled team, and that is exactly why the work lines up: every trade builds on work by someone they know.
One project lead who checks every stage
Before the next stage starts, somebody checks the last one is right. That is exactly where a set of separate subcontractors falls down: everyone does their part and nobody looks at the whole.
You sign it off, and only then pay the balance
At the end you walk your own bathroom from one end to the other. Anything not right gets put right before the final payment.
We come and look before a single tile comes off.
At your home or online, your choice. We look together at what you want and what your room allows. After that you know where you stand.
What you get
- a conversation at your home or online, whenever suits you
- what is possible in your room, and what it would take
- a quote made for your room, only after we have looked
Frequently asked questions.
Does the consultation cost anything?
No. The conversation costs you nothing and commits you to nothing. We look together at what you want and what is technically possible, and after that you get a quote made for your room.
What happens after I fill in the form?
We ring you within one working day to pick a moment. In the consultation we talk through what you want, the state of your bathroom and what you can expect from us.
Can the consultation be online?
Yes. At your home is our preference, because then we see the bathroom itself. If you do not have the keys yet, or the house is still being built, we think it through with you online and pencil the renovation in.
How long does a bathroom renovation take?
Two to three weeks. The waterproof layer has to cure before anything is tiled, and that day never comes out of the plan.
Can I choose my own sanitaryware?
Yes. You supply it yourself or it runs through us, either is fine. What we do is the building: strip-out, pipework, falls, waterproofing, tiling and fitting. That is one total price.
Is your question not here? Ask it here and you will have an answer within 24 hours.
