Rated highly by homeownersRated highly by homeowners across Harrogate

Bathroom fitter in Skipton

Skipton is the western edge of our regular area, and the villages along the Aire valley towards Gargrave are covered from the same run. The crew that comes to you is based in the area, not sent out from the office.

  • five yearsguarantee on installation and fitting
  • one total pricestrip-out, materials, labour and waste
  • we look firstand quote after

Book your free consultation in Skipton

Enter your first name.

Enter your surname.

Enter a valid email address.

Enter a UK phone number, for example 07700 900123.

We ring you within one working day to pick a moment, at your home or online. You are not committed to anything.

Demo form: nothing you type here is sent anywhere.

Stone houses at the edge of the Dales

Many homes in and around Skipton are stone terraces and cottages, with newer estates on the edges of town. Older stone houses often have thick, uneven walls, timber floors upstairs and bathrooms fitted into small rooms.

Uneven walls need a true base before tiling, and older pipework may need replacing rather than reconnecting. Those are the parts of the job you never see afterwards, and they are the parts we check first.

Before and after.

Two jobs we have delivered.

BeforeBathroom before the work, stripped back to the original layout
AfterThe same bathroom after the work, with a walk-in shower and new vanity

Taken over after the work had stalled.

What we found

  • Left half stripped, substrate exposed
  • No record of what had already been done

What we did

  • Mapped the existing situation, repaired the substrate
  • Pipework and wiring pressure tested before anything closed up
  • Falls measured, not guessed
  • Waterproof layer with sealing tape in every corner
BeforeCloakroom before the work, with dated tiling and a pedestal basin
AfterThe same cloakroom after the work, with a wall-hung basin and new tiling

Cloakroom, from dated to plain.

What we found

  • White tiles with a patterned border
  • Old pan and basin
  • Exposed pipework

What we did

  • Large light-format tiles
  • Wall-hung black pan, black basin
  • Wall-mounted tap and recesses set into the tiling
Herringbone tiling in green with a dark stone basin and matt black tap
  • oval mirror
  • green herringbone tiles
Herringbone tiling in green with a dark stone basin and matt black tap
Freestanding bath on timber-effect flooring with a round mirror behind
  • round mirror
  • timber vanity unit
  • freestanding bath
Freestanding bath on timber-effect flooring with a round mirror behind
Oval mirror above a black wall-hung vanity unit
  • lit oval mirror
  • glass shower screen
  • black vanity unit
Oval mirror above a black wall-hung vanity unit

How much does a bathroom renovation in Skipton cost?

It depends on the size of the room, the state of the floor and walls underneath, and the sanitaryware and tiles you choose. You get one total price after the consultation, covering strip-out, materials, labour and waste removal. Sanitaryware is not included.

If a quote sits well under what a bathroom actually costs, something has been left out. You just cannot see what, because it is behind the tiles.

What a full renovation covers, from strip-out to handover, is on the complete bathroom renovation page.

What you find out at the end.

The last day says more about a firm than the first. There is nothing left to win by then, only something to finish.

  • Connecting the sanitaryware and not testing it. Connect, done, gone.
  • Being careless with things that are not theirs. And then you get to sort it out with the shop.
  • Handing over and hoping it is fine, instead of walking the room with you.
  • Taking everything up front, or demanding the balance before you have looked.

How it works with us.

  1. Bathroom with a large round lit mirror, a wall-hung oak vanity unit with two basins and a freestanding bath

    We come and look first. Then a clear price.

    We come out before anything goes on paper. What we see is in the price.

  2. Cloakroom with an oval mirror, marble-effect walls and a wall-hung WC

    Our own fitters no agency cover

    The same people who have worked together for years. They know what the last stage left behind, because they were standing there.

  3. Bathroom with a freestanding bath under a long window, a wall-hung WC and a white towel radiator

    One project lead from strip-out to handover

    Who checks every stage before the next one goes on top of it.

What customers say.

Example reviews, written for this demo in the shape a real profile gives them. Read them all

  • We had the main bathroom and the downstairs loo done. From the first visit to the last day it was properly organised and someone always told us what was happening next. The whole thing went quicker than we expected and the finish is excellent. What I appreciated most was that when we changed our minds about the shower tray halfway through, nobody sighed at us, they just worked out how to do it. Small snags at the end were sorted without us having to chase. Would use them again without hesitating.

    Helen M.Example review

  • Straight away you could tell they knew what they were doing. Turned up when they said, worked carefully, and when extra bits came up they dealt with them and suggested fixes themselves rather than waiting to be asked. Very happy with both the bathroom and the cloakroom.

    Ed W.Example review

  • Good service, lovely people. Always reply quickly and very professional. Really pleased with the whole crew!

    Kerry B.Example review

  • We had a really lovely bathroom and separate WC put in at our new place. The planning stage was handled brilliantly, nothing was treated as impossible, it was just a question of working out how. The team on site were tidy and gave us regular updates. Unfortunately towards the end there was a lack of communication, partly because of someone being off sick. The project overran a bit and it took two handover visits to close everything off properly. Even so, a genuinely beautiful bathroom for a fair price.

    Tom F.Example review

The difference is never in the tiles.

A bathroom renovation is thirteen stages and you only ever see one of them. The rest decide whether it lasts for decades.

layer 01Substrateassessed and repaired
layer 02Pipeworkpressure tested before it closes up
layer 03Fallsmeasured, one to two centimetres per metre
layer 04Primerthe most skipped stage
layer 05Waterproof layerwith sealing tape in every corner
layer 06Adhesivefull notched-trowel bed
layer 07Tilechecked with a spirit level
layer 08Grout and sealantright first time

Look first. Quote after.

A quote given without anyone looking is not a quote. It is a guess.

What you get

  • a conversation at your home or online, whenever suits you
  • what is possible in your room, and what it would take
  • a quote made for your room, only after we have looked

Frequently asked questions.

Do you come out to the villages towards Gargrave?

Yes. The Aire valley villages towards Gargrave are covered from the same run as Skipton.

Where do the fitters travel from?

From your direction. Each area has its own crew who drive to the job from home. Nobody sets off from Harrogate every morning to build your bathroom.

Can you do just the downstairs toilet?

Yes. A cloakroom or downstairs WC is a smaller job, but it has the same layers underneath: the floor, the waterproofing where it is needed, and the pipework. It gets the same care.

When do I get a price?

After the consultation. We look at the room first, then you get one total price. A quote given without looking is a guess.

Keep up with what we build.

Leave your email address. Now and then a finished bathroom in your inbox, and what we found under its tiles.

Demo form: nothing you type here is sent anywhere.