Green herringbone with chrome.

Deep green herringbone tile against pale stone effect, with polished chrome fittings.

White bath with a chrome filler and handset, with two recesses lined in green herringbone tile behind it

Green herringbone against pale stone.

A deep bottle-green herringbone tile that does not fill the room but is used in panels: behind the bath, in the shower, behind the WC. Everything else is pale stone effect and the fittings are polished chrome. Emma's family bathroom has room for both a bath and a walk-in shower.

Shower with green herringbone tile on the side wall, a chrome shower set on the pale wall and a linear drain in the floor
Chrome shower set on the pale wall of the shower, with the green herringbone tile alongside and a recess in the wall

The bath sits in front of two recesses

Behind the white bath are two recesses, both lined in the green herringbone. The filler and the handset are chrome. That makes the green tile the backdrop to the bath rather than a filler for the wall.

Basin with a tall curved chrome tap running, with the green herringbone wall and the black-framed shower screen behind it

In the shower the green is on the side wall

The shower has the green herringbone on its side wall and pale stone effect on the wall with the chrome shower set. A linear drain runs through the floor, and there is another recess set into the wall.

Wall-hung WC against a panel of green herringbone tile, with pale stone-effect tiles beside it and a chrome flush plate

A curved tap and a black frame

Over the basin stands a tall curved chrome tap, with the green herringbone wall behind it and the black-framed shower screen alongside. The wall-hung WC sits against its own panel of the same tile, with warm stone effect beside it.

Two to three weeks, and we come and look first.

This bathroom was built the same way as every other one we hand over: thirteen stages from strip-out to handover, and most of them you never see again once it is finished. That is exactly where a bathroom that lasts parts company with one that starts leaking. The whole job takes two to three weeks, and we come round before anything goes on paper.

See all thirteen stages

More work.

We come and look before a single tile comes off.

At your house or online, your choice. We go through all of it: the floor, the grout, the sealant, the falls, the waste. After that you know exactly what is going on and what will work in your room.

The bathroom survey normally costs

£169

We cover it.

What you get

  • a written report of everything we find
  • a quote for your room, with everything in it
  • an honest answer. If you have got years left in it, we will just tell you that