Loft bathroom under the eaves.

From a bare loft with loose pipework to a bathroom under the sloping roof.

Finished loft bathroom with a shower behind a black-framed sliding door, a matt black wall-hung WC and an oak-effect vanity unit with a black top and a black basin

Before.

BeforeBare loft room during the renovation, with loose pipework, a WC mounting frame and building materials on the floor
BeforeBare wall under the sloping ceiling with pipe connection points and buckets on the floor

After.

AfterThe finished loft bathroom along its length, with the washing machine under the sloping ceiling, the oak-effect vanity unit, the shower and the black WC

From a bare loft to a bathroom under the roof.

This started as a bare loft room with loose pipework and building materials on the floor. What stands there now is a full bathroom under the sloping ceiling, with the washing machine built in. The before and after photos above are of the same room, in Tom and Priya's stone house.

What was there before anything could start

Loose pipework, a WC mounting frame, capped connection points in a bare wall and buckets on the floor. Under a sloping roof nothing is straight to begin with, and where the pipes run decides where the WC and the basin can go.

A sliding door instead of a hinged one

The shower got a black-framed sliding door. Under a sloping ceiling that is not a style choice but a matter of space: a hinged door needs room to swing that is not there.

The washing machine belongs in it

Along the full length stand the shower, the matt black wall-hung WC and the oak-effect vanity with its black top and black basin. The washing machine sits under the lowest part of the roof, where the height could not be used anyway.

Two to three weeks, and we come and look first.

This bathroom was built the same way as every other one we hand over: thirteen stages from strip-out to handover, and most of them you never see again once it is finished. That is exactly where a bathroom that lasts parts company with one that starts leaking. The whole job takes two to three weeks, and we come round before anything goes on paper.

See all thirteen stages

More work.

We come and look before a single tile comes off.

At your house or online, your choice. We go through all of it: the floor, the grout, the sealant, the falls, the waste. After that you know exactly what is going on and what will work in your room.

The bathroom survey normally costs

£169

We cover it.

What you get

  • a written report of everything we find
  • a quote for your room, with everything in it
  • an honest answer. If you have got years left in it, we will just tell you that