Pale stone, walnut and brass.

Pale stone effect on walls and floor, a walnut vanity and brushed brass throughout.

Wide walnut vanity unit with two white basins, two tall brushed brass taps and a long backlit mirror above it

Light, with walnut and brass.

Pale stone effect on the walls and the floor, and against it a wide walnut vanity with brushed brass. Richard and Anna had the downstairs cloakroom done in the same materials at the same time, so the two rooms belong together.

Vanity unit with a backlit mirror beside a walk-in shower with a smoked glass screen and a brushed brass rain shower
Separate cloakroom with a small walnut vanity unit, a matt black tap and an organically shaped mirror

Two taps on one long vanity

The walnut vanity runs the full width of the wall and carries two tall brushed brass taps. Above it is a long mirror with a soft light behind it, wide enough to catch the shower and the brass towel radiator in its reflection.

Walk-in shower with a brushed brass rain shower on a tall riser, a smoked glass screen and a long linear floor drain

A walk-in shower behind smoked glass

The shower is a walk-in behind a smoked grey glass screen, so the light carries through while the space stays separate. The rain shower sits on a tall riser in the same brushed brass, and a long drain runs across the floor.

Long backlit mirror above the basins, with the brushed brass towel radiator on the wall beside it

The cloakroom came along too

The cloakroom got a small walnut vanity, a matt black tap and a mirror with a soft, rounded shape. The same wood as the bathroom upstairs, at a smaller size.

Two to three weeks, and we come and look first.

This bathroom was built the same way as every other one we hand over: thirteen stages from strip-out to handover, and most of them you never see again once it is finished. That is exactly where a bathroom that lasts parts company with one that starts leaking. The whole job takes two to three weeks, and we come round before anything goes on paper.

See all thirteen stages

More work.

We come and look before a single tile comes off.

At your house or online, your choice. We go through all of it: the floor, the grout, the sealant, the falls, the waste. After that you know exactly what is going on and what will work in your room.

The bathroom survey normally costs

£169

We cover it.

What you get

  • a written report of everything we find
  • a quote for your room, with everything in it
  • an honest answer. If you have got years left in it, we will just tell you that